Bazı okullarda staj defteri yerine staj raporu + sunum şeklinde staj değerlendirilebiliyor. Bu şekilde staj raporu hazırlayacak arkadaşlarımızın fikir edinebilmesi ve yararlanması için bu raporu sizlerle paylaşmak istedim.
Aşağıdaki linke tıklayarak raporu indirebilirsiniz. (Firma bilgilerini paylaşmak istemediğim için birkaç bölüm silinmiştir.)
Staj Raporundan Bazı bölümler
ABSTRACT
In this report, I am telling about my summer internship’s details. This experience was very
important for me because I was wondering very much the application of civil engineering in field. Summer internship was a good opportunity to see real sides of civil engineering and decide the way for future. I saw good and bad sides of construction site and I tried to explain all of my experiences.Also, I mentioned some standards, experiments and applications. I did a lot of observations during my internship and included them in my report with the details. I also included a photo of things that I thought were important.
TABLE OF CONTENTS
TABLE OF CONTENTS
I. INTRODUCTION
1.1 COMPANY
1.2 PROJECT
II. DETAILS OF WORK DONE
2.1 INTRODUCTION
2.2 BORED PILE
2.3 FOUNDATION
2.4 REINFORCEMENT
2.5 FILLING THE CRANE GAP
2.6 EXPERIMENTS
2.7 PROJECT MANAGEMENT OBSERVATIONS
IV. PERSONAL OBSERVATIONS
V. CONCLUSION
References
2.1. INTRODUCTION
This project resides in Beytepe/Ankara . There are 4 blocks (A,B,C,D) which are residences and 1 block is a commercial building. 2 blocks (A, B) are high rise residences and other 2 blocks (C, D) 2 are villa type. When I began, villas were done, commercial block was done, B block’s foundation had not begun and block A was at 23rd floor. In the last days of my internship, block A was reached the last level and block B’s foundation was almost finished. We used C25 type for bored piles, C30 type concrete for foundation and C35 type concrete for spire. There was one tower crane for all works. They moved the tower crane between blocks. Residences have two elevators and one emergency elevator. As a heat supply system, down-feed heating system was used.